White River Hydro Project

- 2015 -

Location: Marathon, Ontario

Client: Dragados Canada, Inc.

Transmission Line Voltage: 115kV

Transmission Line Length: 24km

Structure Type: Single Wood Pole Wishbone

# of Structures: N/A

Major River Crossing: White River

Major Highway Crossing: Trans-Canada Highway 17

Rough Terrain: 100% offroad construction