P21G Structure Replacement

- 2006 -

Location: Sault Ste. Marie, Ontario

Client: Brookfield Power, Great Lakes Power

Transmission Line Voltage: 230kV

Transmission Line Length: 80km

Structure Type: N/A

# of Structures: N/A

Old Structure Type: 2-Pole Wood Gulfport Type

New Structure Type: 2-Pole Composite H-Frame Type

Structures Replaced: 139

Services provided:

  • Access Mapping
  • Trail Building
  • New Structure Installation
  • Old Structure Removal
  • Material Procurement

Other Challenges:

  • 100% Offroad Construction
  • Extensive Bedrock Content
  • Steep, difficult to climb hills
  • Spotty road access